Monday to Friday, 9am to 6pm RIBA Chartered Practice · ARB-registered architects +44 (0) 20 800 444 64
F‑Line Designs

Services / Build over agreements and drainage

Build over agreements and drainage

If your extension is over or near a public sewer, Thames Water must agree before you build. We check the sewer records, arrange CCTV surveys and prepare and manage the application.

FeesFixed fee for each stageagreed in writing before work starts

Request a fee proposal How our fees work

Build over agreements and drainage project, designed within the Green Code group

What we do

Build over

What's included

Priced once we know whether a sewer is affected and what Thames Water will ask for.

  • Sewer record search and build over check
  • CCTV survey arranged where needed
  • Build over drawings coordinated with the structure
  • Application submitted and managed with Thames Water
  • Close-out at the end of construction

Before you start

What we need, and what sits outside our fee

  • From you: the property address, a few photos, and any existing drawings, planning approvals or surveys you have. We arrange the measured survey with you.
  • Not in our fee: council planning and building control fees, and specialist reports a council asks for, such as a tree survey or flood risk assessment, unless your fee proposal lists them.
  • Your fee proposal sets out exactly what is included for your project before any work starts.

Timescales

How long it takes

We give you a timetable for our work in your fee proposal. Council and other statutory timings start once an application is validated.

Sewer check
Before the building regulations drawings are finished
Thames Water review
Varies with the application; we apply as early as the design allows
Close-out
After the work is built, before completion

Common questions

When do I need a build over agreement?

When you build over or within 3 metres of a public sewer. Since 2011 many shared drains behind London houses are public sewers, so rear extensions are often affected even when the drain looks private.

Will Thames Water ask for a CCTV survey?

Often, yes, to confirm the sewer's route, depth and condition before and sometimes after the work.

Can I get approval after building?

Yes. A retrospective build over application can be made, and is often needed when a buyer's solicitor asks for it.

Other services

Where we work

Build over agreements and drainage across London

Check your council by postcode

Local planning points for the boroughs closest to our Cricklewood studio: Ealing, Harrow, Brent, Hillingdon, Hounslow, Haringey, Enfield, Barnet, Camden, Westminster, Hammersmith and Fulham, Kensington and Chelsea. See all 33 boroughs.

Fixed fees, agreed before we begin

Tell us about your project. We'll send a fee proposal.

Enquire or call +44 (0) 20 800 444 64

Call us Get a fee proposal