Monday to Friday, 9am to 6pm RIBA Chartered Practice · ARB-registered architects +44 (0) 20 800 444 64
F‑Line Designs

Services / Structural calculations

Structural calculations

Structural drawings and calculations for building control, designed by engineers within the Green Code group and coordinated with your drawings.

FeesFixed fee for each stageagreed in writing before work starts

Request a fee proposal How our fees work

Structural calculations project, designed within the Green Code group

What we draw

Structural calculations

What's included

Beams, steels and foundations designed and calculated by engineers within the Green Code group.

  • Structural drawings
  • Calculations for building control
  • Steel and beam schedules for your builder

Before you start

What we need, and what sits outside our fee

  • From you: the property address, a few photos, and any existing drawings, planning approvals or surveys you have. We arrange the measured survey with you.
  • Not in our fee: council planning and building control fees, and specialist reports a council asks for, such as a tree survey or flood risk assessment, unless your fee proposal lists them.
  • Your fee proposal sets out exactly what is included for your project before any work starts.

Timescales

How long it takes

We give you a timetable for our drawings in your fee proposal. Council and building control timings are the statutory or target periods and start once an application is validated.

Calculations
Prepared alongside the building regulations drawings
Building control check
Part of the full plans decision: 5 weeks, or up to 2 months if you agree

Common questions

Why use the same team for drawings and structure?

Because the beam sizes, ceiling heights and drawings have to agree. Doing them together avoids clashes found on site.

When do I need structural calculations?

Whenever the work changes how the building carries its load: removing or opening up a load-bearing wall, a loft conversion, a new floor, or new foundations. Building control will ask for calculations before approving the work.

Do I need them for a building notice?

Yes. Even without a full plans application, building control will want calculations for any beams or structural changes before the work is covered up.

Other services

Where we work

Structural calculations across London

Check your council by postcode

Local planning points for the boroughs closest to our Cricklewood studio: Ealing, Harrow, Brent, Hillingdon, Hounslow, Haringey, Enfield, Barnet, Camden, Westminster, Hammersmith and Fulham, Kensington and Chelsea. See all 33 boroughs.

Fixed fees, agreed before we begin

Tell us about your project. We'll send a fee proposal.

Enquire or call +44 (0) 20 800 444 64

Call us Get a fee proposal