Monday to Friday, 9am to 6pm RIBA Chartered Practice · ARB-registered architects +44 (0) 20 800 444 64
F‑Line Designs

Services / Change of use

Change of use

Applications to change the use of a building, such as shop to home or office to flats, including prior approval where it applies.

FeesFixed fee for each stageagreed in writing before work starts

Request a fee proposal How our fees work

Change of use project, designed within the Green Code group

What we draw

Before you start

What we need, and what sits outside our fee

  • From you: the property address, a few photos, and any existing drawings, planning approvals or surveys you have. We arrange the measured survey with you.
  • Not in our fee: council planning and building control fees, and specialist reports a council asks for, such as a tree survey or flood risk assessment, unless your fee proposal lists them.
  • Your fee proposal sets out exactly what is included for your project before any work starts.

Timescales

How long it takes

We give you a timetable for our drawings in your fee proposal. Council and building control timings are the statutory or target periods and start once an application is validated.

Planning application
Target of 8 weeks after validation
Commercial to residential prior approval (Class MA)
56 days
Building regulations full plans
5 weeks, or up to 2 months if you agree

Projects

Change of use we have designed

All projects

Common questions

How do I know which route applies?

It depends on the current use, the proposed use and any local restrictions. We check before quoting.

Do I need permission to turn a house into an HMO?

For a small HMO of three to six people, often not, because it is permitted development. Many London boroughs remove that right with an Article 4 direction, so we check your address first. A large HMO for seven or more people always needs planning permission.

What is prior approval?

A quicker, narrower process for some changes of use that are permitted development. The council can only consider set matters, such as transport, flood risk, noise and daylight, and decides within 56 days for commercial to residential conversions.

Other services

Where we work

Change of use across London

Check your council by postcode

Local planning points for the boroughs closest to our Cricklewood studio: Ealing, Harrow, Brent, Hillingdon, Hounslow, Haringey, Enfield, Barnet, Camden, Westminster, Hammersmith and Fulham, Kensington and Chelsea. See all 33 boroughs.

Fixed fees, agreed before we begin

Tell us about your project. We'll send a fee proposal.

Enquire or call +44 (0) 20 800 444 64

Call us Get a fee proposal